Past reference

Studies · Budget de l'État

Detailed technical studies for the Ouagadougou – Bobo-Dioulasso motorway

333km

01

Background

Detailed technical studies and preparation of the tender documents for the development and construction works on the motorway between Ouagadougou and Bobo-Dioulasso (about 333 km).

02

ACE's role

Detailed technical studies and preparation of the tender documents

Planning a similar project?

Call Contact us