Past reference
Construction supervision · Banque Islamique de Développement (BID) / État du Cameroun
Technical supervision and control of the Lena – Tibati road
135,1km
01
Background
Technical supervision and control of the development works on the Lena – Tibati road section, divided into two lots, together with the associated works. Lot 5: Lena – Sengbe (71.5 km); Lot 6: Sengbe – Tibati (63.6 km).
02
ACE's role
Technical supervision and control
References
Similar projects
Cameroon
Works management
Works management of the Edéa – Kribi road, Edéa/Kribi junction – Bivouba bridge section
Full works management
- Funder
- Banque Africaine de Développement (BAD)
- Date
- 2024
Cameroon
Works management
Works management of the Edéa – Kribi road, Bivouba bridge – Kribi section
Full works management
- Funder
- Banque Africaine de Développement (BAD)
- Date
- 2024
Cameroon
Works management
Works management for the access roads to the Kribi industrial and port zone (PARZIK)
Full works management
- Funder
- Banque Africaine de Développement (BAD)
- Date
- 2024